BONAIRE WINDOW COOLER
Installation
Unit Wall Installation (continued)
Water Connection
Install a sillcock and water valve (not supplied) to the faucet
closest to the cooler and attach water supply line between
cooler and water valve.
The overflow is factory fitted. The bleed hose protruding through
the overflow fitting SHOULD bleed water during normal
operation at a rate between 1.5 – 3 gallons per hour (6 – 12
Litres per hour). This is normal and is designed to preserve the
quality of the Cooler and Cooling efficiency of the Unit. If
required this Bleed water can be plumbed away using standard
'over-the-counter' garden hose and fittings.
The float valve is factory set and should require no further
adjustment at time of installation (see page 18 if adjustment is
required).
Your cooler is now ready for startup checklist (see below).
Page | 14