Preventative Maintenance Kits; Required Every 12 Months; Maintenance Procedures - Parker BAF010 Guía Del Usario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Preventative Maintenance Kits

Required every 12 months

4.2 Maintenance Procedures

The following maintenance procedures should only be performed by competent, trained, qualified personnel and
approved by Parker domnick hunter.
Slowly close the inlet (1) and regulator (2) valves which will isolate and depressurise the filter
Description
BAF-PMK 10-12
BAF-PMK 15-12
1
Contents
010AA
010AC (x4
Seals
Capillary ring
Auto drain
015AA
015AC
Seals
Auto drain
2
11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Baf015

Tabla de contenido