Drain Piping - Daikin UATYP60AGXY1 Manual De Instalación

Unidades del conjunto del tejado
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 67
1.4 Unit Lifting
Hanger brackets at 4 corner of the unit are
used for unit lifting purpose.
The angle A of the chain should be at least 45°,
and insulation should be added at 4 corner of
the chain to prevent the damage of the panel
when lifting.

1.5 Drain piping

A 1 FPT condensate drain fitting is provided. The drain pipe can
be led out at the front side.
The drain pipe must be provided with a trap on the outside of
the unit and also installed at an incline for proper drainage, as
shown in the right.
To prevent condensate formation and leakage, provide the drain
pipe with insulation to safeguard against sweating.
Upon completion of the piping work, check that there is no
leakage and that the water drains off properly.
The drain piping should have a drain trap.
A  70mm
B  2C
C  2X ESP
Drain trap
Note: ESP = External Static Pressure
Drain trap for condensate
INSTALLATION OF THE UNIT
UAT(Y)(P)60~200A
Drain piping
The drain pipe
should extend
below this level.
3
UAT(Y)(P)250, 300A
Hanger Bracket
Spreader Bar
Chain
Lifting Holes for shackle
(4 corners)
UAT(Y)(P)360, 420A
Chain
Lifting Beam

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido