SECTION 2 - INSTALLATION
B.

Stacking

For single ovens, skip ahead to Part C, Conveyor
Installation.
IMPORTANT
Middleby Marshall STRONGLY RECOMMENDS that PS536
oven cavities be stacked using the following:
PS500 Series Stacking Lift Kit, P/N 30580
PS536 Stacking Hardware Kit, P/N XXXXX
Contact your Middleby Marshall Authorized Service Agent for
complete stacking instructions.
1.
Assemble the stacking spacer(s) as shown in Figure 2-6.
One spacer assembly is supplied for a double oven, while
two are supplied for a triple oven.
2.
Place one of the assembled spacers on top of the lower
oven cavity, making sure that the insulation faces up.
3.
Stack an oven cavity on top of the spacer. Check that all four
sides of the spacer overlap the base of the oven, and that
the oven is level and firmly seated. See Figure 2-7.
4.
For triple ovens, repeat Steps 2 and 3 to install the top oven
cavity.
5.
Install the top panel using the screws included in the base pad
kit, as shown in Figure 2-8.
Figure 2-7 - Stacking
Figure 2-6 - Assembling the stacking spacers
38mm-thick
insulation, pre-cut
Figure 2-8 - Top panel installation
#10 x 2" screws
attach rear of
top panel
#10 x 1" screws
attach front of
top panel
Assembled
spacer
Insulation
faces up
10
#10-32 x 1/2"
hex screws
Stacking panel,
P/N 44837
Top panel,
P/N 42882
Top
panel