Front View; Side View; Bottom View; Recess-Mounted Cabinet Installation - Bradley S19-2000 Serie Instrucciones Para La Instalacion Y Mantenimiento

Ocultar thumbs Ver también para S19-2000 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Bradley EFX 8 Thermostatic Mixing Valve with Optional Cabinet
Model S19-2000 Series
Installation Instructions: Valve with Optional Recess-Mounted Cabinet
Note: Flush the supply lines before beginning installation.
1. Rough in a 11-1/2" W x 13" H hole in the wall for the cabinet (see Figure 3).
2. Measure and mark the cabinet mounting hole locations at the dimensions shown in Figure 3. Install four
1/4" wall anchors, if required (supplied by installer).
3. Insert the cabinet into the wall opening and secure into place with four 1/4" wall fasteners (supplied by
installer).
4. Insert the valve into the bracket in the cabinet (right side of the valve goes in first). Install the valve,
elbows and stops onto the inlet and outlet piping.
5. Continue with the valve installation procedure found on page 3.

FRONT VIEW

5-3/8"
(137)
11-1/4"
(286)
Door
3"
(76)
(330)
Figure 3
4
9-3/4"
(248)
Door
Flange
14-1/2"
(368)
5"
(127)
11"
(279)
Box
13"

BOTTOM VIEW

11"
11"
(279)
(270)
5/14/08
Installation and Maintenance Instructions
2-1/2"
1/2" NPT Outlet
(64)
7-1/2"
(190)
9/32" (6) Ø Holes
(4) Each Side
(8) Total
Bradley Corporation • 215-1291 Rev. L; EN 07-903A

SIDE VIEW

2"
(51)
2"
(51)
2-1/2"
(64)
12-1/2"
(318)
2-1/4"
(57)
6-1/2"
(165)
1/2" NPT Inlets

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

S19-2000efx serie

Tabla de contenido