EN
(Solution 2)
34
Mark Points
Note: The specified values are [mm].
(1) Mark a point (1) on the horizontal line A, 80 mm to the right of the vertical
reference line. Repeat this operation on the other side and on the vertical reference
line, checking that the three marks are leveled.
(2) Mark a point (2) on the horizontal line B, 40 mm to the right of the vertical
reference line. Repeat this operation on the other side , checking that the two marks
are leveled.
(3) Mark a point (3) on the horizontal line C, 180 mm to the right of the vertical
reference line (Solution 2). Repeat this operation on the other side , checking that
the two marks are leveled.
Option
Chimney
1
400+0
2
400+300
3
400+390
X
/
390-620
390-710