Checking, Test Running And Configuring The Control Panels; Switching On A Panel; Switch Off A Panel; Meaning Led Indicator Lights - Vetus ELPS Manual Del Propietário

Palanca de control del motor e-line
Ocultar thumbs Ver también para ELPS:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 25
3

Checking, test running and configuring the control panels

3 .1

Switching on a panel

• Turn on the key switch.
• Move the lever to the neural position. Gently press the "ON / OFF"
button twice in succession.
After the switch is pressed once the LED will flash green and the
buzzer will sound continuously didididididi..... (. . . . . . .) The 'ON/OFF'
switch must be pressed a second time within 6 seconds. The LED
(blue) will remain on and the buzzer will confirm that the panel is
ready for use by giving the signal dahdidah (- . -).
If a second panel is connected the LED on the panel 'which has not
been switched ON' will flash (every second two short blue flashes,
heartbeat).
3 .2

Switch off a panel

Press once the 'ON/OFF' button, the buzzer will reply with the signal
didididahdidah ( . . . - . - ).
• Turn off the key switch.
• Turn off the battery main switch when leaving the boat.
3 .3

Meaning LED indicator lights

For the meaning of the LED indicator lights, see table page 68.
3 .4

Restore factory settings

Switch off all control panels (see 3.2) and perform the following actions on the control panel to restore the factory settings of the relevant
panel:
1
30 seconds
1 Press and hold the "ON /
OFF" button for 30 seconds.
3 .5

Configuring the panels

• Carry out the configuration on the panel intended to control a
port or starboard motor, see 3.6.
• Carry out the configuration for
the steering position on which
the panel is placed, see 3.7.
• If, during the test run, it appears
that the movement of the boat
is opposite to the direction in
which the lever is moved, this can
be adjusted as indicated in 3.8.
vetus® Owner's manual E-Line motor control lever ELPS
2
dahdidididah ( - . . . - )
2 After 30 seconds the PWR LED flashes, the ECO LED lights up
and you hear the signal, dah-di-di-dah ( - . . . - ). Now release
the 'ON/OFF' button.
2
3
1
Test the E-Line motor only if you are sure that persons are at a
safe distance from the propeller!
ON/OFF
3
3 Press the 'ON/OFF' button once. All
LEDs are off and you will hear the sig-
nal, di-da ( .- ). The factory settings of
this control panel have been restored.
Keep to the following sequence for configuring the panels:
1) Configure a panel to control a port or starboard motor (see
3.6),
2) Configuring a panel for the steering position where the panel
is placed (see 3.7),
3) Change thrust direction (only if necessary during test runs, see
3.8)
The operations shown must be carried out on each panel installed .
ENGLISH
W
arninG
1 x
n
ote
0370401.01
11

Publicidad

Tabla de contenido
loading

Tabla de contenido