Levolor Cellular Shades Guia De Instalacion página 9

Ocultar thumbs Ver también para Cellular Shades:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSIDE MOUNT (IM)
STEP 2: INSTALLING THE BRACKETS
Pre-drill screw holes using a
using pencil marks as a guide.
Hold the bracket with the surface marked "Top" facing up. Line up the pre-drilled
screw holes and the longer, oblong holes in the bracket.
While holding the bracket in place, secure the bracket with screws, 2 screws
per bracket.
Repeat for each bracket.
Ensure all brackets are square with each other.
Bracket
Bracket
Screw
Screw
" drill bit (wood and metal mounting surfaces only)
1
16
INSTALLATION
Cordless Lift Control
9

Publicidad

Tabla de contenido
loading

Productos relacionados para Levolor Cellular Shades

Tabla de contenido