There should be a clearance of 1.5 mm. between the pinion and rack over the whole length of the gate (Fig. 8).
N.B.: This operation is very important for the operation and durability of the gear motor. The load of the gate should not weigh on the pinion because it may
damage the automatic gate system.
Securing the rack
After unlocking the actuator close the gate completely (see image of Fig. 2.2).
Rest the rack against the pinion of the gear motor. Before doing the drilling for the fastener, check that the screws do not go into line with the wheels.
Start securing the first metre of rack, moving the gate manually towards the opening, checking that it rests properly with the pinion of the actuator.
Move the second element of the rack near to the previous one, using a piece of rack to align the teeth of the 2 elements correctly (see figure 9).
Use the screws to secure the second element of the rack and repeat the procedure all along the gate.
16
1.5 mm obtained at the end of the adjustment
Fig. 8
Fig. 9