Installing the new
machine
This machine for the
production of cold drink,
slush, and slush grants the
absolute homogeneity of the
product and the possibility to
regulate its density thanks to
an innovative electronic
control. Before installing the
machine, verify that:
− − − − Big Biz is not placed by
an heat source;
− − − − The machine has not
been damaged during
transportation. In case of
doubt, contact the
supplier;
− − − − The power supply
system is endowed with
a grounding that
respects the rules of law;
− − − − The power supply
system capacity is
adequate to the
maximum power of the
machine, as indicated on
the plate (pic.4 pag.14).
In case of doubt, contact only
qualified staff.
In order to install the
machine, carefully read the
following instructions.
This machine is only for the
use it has been manufactured
for. Any other usage is to be
considered as improper and
dangerous.
Machine description
(pic.1 pag.14):
− − − − Lamp
− − − − Transparent tank
− − − − Auger ring nut
− − − − Supply outlet
− − − − Hooks for the tanks
removal
− − − − Control electronic board
− − − − Main switch
− − − − Drip tray
− − − − Plate data
It is suggested that the
machine is installed only by
qualified staff. A wrong
installation can cause
damage to people or things,
for which things the
manufacturer declines any
responsibility.
Once the machine is
unpacked, verify the integrity
of the machine. The
packaging elements (plastic
bags, expanded polystyrene,
nails, etc.) must not be left at
children reach as they might
be dangerous.
Remove the protection
plastic stripes also from the
internal side of the grids.
We do not recommend to
plug the machine using
adaptors, multiple plugs
and/or extensions.
If necessary, use only
materials that conform to the
security rules in force, as for
the current intensity up to
what indicated on the plate
(pic.4 pag.14).
Place the machine so as to
avoid any heat source to be
close to the grids. Verify that
there is a free space of 25 cm
at least around the machine
(pic.5 pag.43).
After connecting the machine
to the power supply and
switching on the main switch,
verify that air comes out from
the side grids (pic.6 pag.43).
Before switching on the
machine, it is necessary to
clean it as indicated in the
"Cleaning" paragraph.
- 15 -