Preparing For Installation - LG LUTD4919SN Manual Del Propietário

Cocina doble combustible
Ocultar thumbs Ver también para LUTD4919SN:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Preparing for Installation

Tools Needed
Phillips screwdriver
Level
Pipe wrench (2)
(one for support)
Parts Provided
Template (1)
Anti-tip bracket kit (1)
Anchor sleeves (6)
Materials You May Need
• Gas line shut-off valve
• Pipe joint sealant that resists action of natural and LP gases
• Flexible metal appliance connector (
Never use an old connector when installing a new range.
• Flare union adapter for connection to gas supply line (
• Flare union adapter for connection to pressure regulator on range (
• Liquid leak detector or soapy water
• Lag bolt or
/
" O.D. sleeve anchor (for concrete floors only)
1
2
Flat-blade screwdriver
Open-end or
adjustable wrench
Lag bolts (6)
/
" or
/
" NPT x
3
1
4
2
1
/
" Nut driver
4
Drill
Safety glasses
Parts not Provided
4-Wire cord or
3-Wire cord
(UL approved 40 or 50
AMP)
/
" I.D.)
1
2
/
" or
/
" NPT x
/
" I.D.)
3
1
1
4
2
2
/
" NPT x
1
2
INSTALLATION
Pliers
Tape measure
Gloves
Strain relief
(For conduit
Installations only)
/
" I.D.)
1
2
15

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Signature lutd4919sn

Tabla de contenido