2-3. Single UPS Installation

Installation and wiring must be performed in accordance with the local electric laws/regulations and execute the
following instructions by professional personnel.
1)
Make sure the mains wire and breakers in the building are enough for the rated capacity of UPS to avoid the
hazards of electric shock or fire.
EN
NOTE: Do not use the wall receptacle as the input power source for the UPS, as its rated current is less than the
UPS's maximum input current. Otherwise the receptacle may be burned and destroyed.
2) Switch off the mains switch in the building before installation.
3) Turn off all the connected devices before connecting to the UPS and then switch off the internal output
breaker.
4) Prepare wires based on the following table:
Model
6000
6000L
10000
10000L
6000R
6000RL
10000R
10000RL
NOTE 1: The cable for 6000/6000L should be able to withstand over 40A current. It is recommended to use
10AWG or thicker wire for safety and efficiency.
NOTE 2: The cable for 10000/10000L should be able to withstand over 63A current. It is recommended to use
8AWG or thicker wire for safety and efficiency.
NOTE 3: The selections for color of wires should be followed by the local electrical laws and regulations.
5)
Remove the terminal block cover on the rear panel of UPS. Then connect the wires according to the following
terminal block diagrams: (Connect the earth wire first when making wire connection. Disconnect the earth wire last
when making wire disconnection!)
Output 1 Line
Output 1 Neutral
Output 2 Line
Wiring spec (AWG)
Input
Output
10
10
10
10
8
8
8
8
10
10
10
10
8
8
8
8
Terminal Block wiring diagram of 6000(L)/10000(L)
Battery
Ground
10
10
10
8
8
8
10
10
10
8
8
8
7
Input Neutral
Input Line
Output 2 Neutral