During Assembly; Important Recommendations - Palram Balance 8x8 Manual De Instrucciones

Ocultar thumbs Ver también para Balance 8x8:
Tabla de contenido

Publicidad

EN
» During Assembly
Make sure the base is square by measuring the diagonals and level by using a spirit level.
Peel the film covering the panel. Make sure you install it with the UV protected side out.
You may use Silicon lubricant spray in order to help you slide the panels into the profiles.
Do not spray the Polycarbonate panels.
Use a rubber mallet if necessary.
All panels with the stamped words THIS SIDE OUT must be facing out to create
full UV protection. Remove plastic sticker as panels are locked in place.
During assembly you will encounter the information icon, please refer to the
relevant assembly step for additional comments and assistance.
This icon indicates
that the installer should
be inside the product.
Step 3: Refers only for the extension kit! The extension kit contains a base connector, either part
#8447 or #7601
Step 13: Tighten the screws once the back beam is set accordingly (Diagram b)
Step 52: Decide on the window's location before assembly. Windows can be installed in one of the 4
indicated options.
If you have purchased an Extension Kit, please note part 7316 should be assembled with its short
end towards the window.
Step 64: In case the window doesn't closed properly, please release the screws, adjust the profile
and tighten the screw.
Step 73: Please note you should insert the screws and leave as is as shown in the circular
enlargements
Step 80: Choose the appropriate anchoring according to the existing base. screws and masonry
anchors are not supplied.
This icon indicates that
the installer should be
outside the product.

Important Recommendations

Firmly connect the greenhouse to a level position immediately after completion of the
assembly.
In order to anchor the greenhouse use the designated manufacturer anchoring kit.
Anchoring the greenhouse can also be done by drilling the base profiles and fastening it to
the ground using ground screws or spikes (screws and spikes are not supplied).
Tighten all screws once assembly is completed.
Please note: Anchoring this product to the ground is essential to its stability and rigidity.
It is required to complete this stage in order for your warranty to be valid.
Note: all the extension module steps are marked with a dashed outline, should be performed
during the greenhouse assembly process.
Screws 411 and nuts 412 are used throughout the assembly process.
Screws 411 are to be assembled from the outside and nuts 412 from the inside of the greenhouse.
If not specified otherwise, do not fasten screws and nuts (411 & 412) more than
2-3 turns only. Do not tighten them until completion of the panels' assembly.
These 2 icons indicate if screws' tightening is required or not.
However, in some steps, temporary tightening of a few screws may be needed to prevent a
profile from falling.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Balance 8x4 extension module

Tabla de contenido