Step 2: Cabinet Preparation - JENN-AIR PRG4810NP Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 2: CABINET PREPARATION

1. The range is a free-standing unit. If the unit is to be
placed adjacent to cabinets, the clearances shown in
Figures 2A/B/C are required. The same clearances
apply to island installations.
2. The range can be placed in various positions with
respect to the cabinet front, with the front either flush or
projecting, depending on the countertop depth. See
FIGURE 2A
(PRG3010)
Figure 3A/B and Table 2 (side view of range) for
dimensions.
3. The gas and electrical supply should be within the
zones shown in Figures 2 and 4.
4. The maximum depth of over head cabinets installed on
either side of the hood is 13².
(PRG4810)
FIGURE 2C
5
(PRG3610)
FIGURE 2B

Publicidad

Tabla de contenido
loading

Tabla de contenido