STEP 17
PLUG IN THE PUMP AND TWEAK THE WATERFALL
• When the basin is fi lled and
all of the black waterfall
foam is dry (if used on
project), plug the pump in
and test the waterfall.
WARNING
Any electrical should
be plugged into a GFCI rated receptacle.
• You can tweak the waterfall by placing smaller stones
and gravel on the waterfall cascades. This will change
the appearance and sound of the water. Have fun playing
with the water coming over the falls until you achieve the
desired effect.
20
STEP 18
TRIM THE LINER
• With the waterfall running,
go around and trim off any
excess liner leaving several
inches above the water
level/water splash as a
precaution. The remaining
liner edges can be covered
with gravel or other suitable
landscape material.
Note: Do not trim the
liner until the waterfall is running and the basin is fi lled
to the desired level. Prematurely trimming the liner
may cause leaks!
STEP 19
MULCH THE BERM AND NATURALIZE EDGES
• The entire area surrounding the basin can now be
mulched and any surrounding plants added.
www.aquascapeinc.com