Assembling The Rack - Gladiator GEARLOFT GALS24M1KG Instrucciones De Ensamblaje

Estantería de almacenamiento
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1.
Determine the ceiling bracket
locations
Parallel layout
24"
P2
P2
48"
P2
P2
48"
2' x 4'
24"
48"
P2
P2
Perpendicular layout
24"
48"
P2
P2
26"
P2
P2
2' x 4'
48"
P2
P2
P2
The storage rack ceiling brackets can be positioned parallel
or perpendicular to the wood ceiling joists/rafters. Determine
the application required for your desired installation. If drywall
covers the joists, use a stud finder to determine the joist/rafter
locations and mark with masking tape. For applications requiring
installation of the brackets perpendicular to the joists/rafters,
the maximum distance between them is 24". The brackets
included allow for a 24" maximum span. See figure for typical
ceiling layouts. Mark the location of the ceiling brackets on the
joists/rafters or drywall, making sure the vertical supports can
be positioned between the lag bolts use to attach the brackets.
Position the center of the brackets on a 24"/48" grid as required.
8

Assembling the Rack

P2
48"
P2
P2
4' x 4'
P2
24"
P2
48"
P2
P2
2' x 8'
48"
P2
26"
P2
P2
P2
24"
48"
P2
26"
P2
2' x 8'
2.
Attach the ceiling brackets
48"
P2
F2
P2
F2
Using the provided drill bit (3/16"), drill all pilot holes in the center
of the joists/rafters. Two lag bolts must be used on each bracket,
48"
one on each side of the vertical support. Mount the ceiling
brackets (P2) using 5/16" x 3" lag bolts (F2) (8 or 12).
P2
4' x 4'
P2
F2
P3
Corner Support
(4 Required)
P4
F2
P5
P6
Center Support
(If Required)
F2
5/16" x 3" Lag bolt

Publicidad

Tabla de contenido
loading

Tabla de contenido