q
z
x
e
c
r
v
t
w
y
Inserting the bobbin
z Place the bobbin in the bobbin holder with the thread
running off as illustrated.
q Thread
x Guide the thread into the front notch on the front side
of the bobbin holder. Draw the thread to the left,
sliding it between the tension spring blades.
w Front notch
e Tension spring blade
c Continue to draw the thread lightly until the thread
slips into the side notch.
r Side notch
v Pull out about 4˝ (10 cm) of thread. Attach the hook
cover plate by inserting the 2 prongs on left of the
hook cover plate into the openings. Lower the right
side unitl it clicks into place as illustrated. Check the
threading by referring to the chart shown on the hook
cover plate.
t Thread
y Hook cover plate
24