INSTALLATION

EBM Installation

NOTE Up to four EBMs may be connected to the UPS. If there are two UPSs in a rack, up to
two EBMs may be connected to each UPS.
To install the EBM(s):
1.
2.
Communication Port
UPS Battery
Connector
REPO Port
EBM Battery
Connectors
NOTE The batteries charge to 90% capacity in approximately 3 hours. However, it is
recommended that the batteries charge for 24 hours after installation or long-term storage.
NOTE If you installed power management software and optional EBMs, ensure maximum
battery runtime by using the ERM configuration tool on the Software Suite CD.
NOTE If more than two EBMs are installed, an external battery charger is recommended
for faster recharge times.
4
EATON Powerware
Verify that all battery circuit breakers are in the OFF (O) position
(see Figure 3).
Plug the EBM cable(s) into the battery connectors as shown in
Figure 3. Up to four EBMs may be connected to the UPS.
Input Connector
Power Cord
Figure 3. Typical EBM Installation
®
5125 (9910-P33) EBM Installation Guide for IBM
Circuit Breakers
Output
Receptacles
EBM
Cable
ON
OFF
Battery Circuit Breaker
S
®
Applications
164201358 Rev C