Installation Layout
■ High pressure agricultural building radiant heaters
use an integral hanging bracket with quick link for
hanging the heater.
■ Attach only steel cable or chain to the quick link.
Do not use combustible hanging materials such as
ropes, lines, etc.
■ The installer must make sure that the heater is hung
so control end of heater is positioned 1º to 5º down
from horizontal after gas supply hose is attached.
This allows proper venting of heater and eliminates
potential heat damage to optional dust fi lter.
■ Repositioning of factory installed quick link into hang-
ing bracket may be required.
■ Refer to following illustrations.
FIG. 2
3 FT. MINIMUM BROODER
BROODER TOP TO CEILING
GAS PIPING
CONTROL PANEL
HANG THE HEATER WITH THE CONTROL
HANG THE HEATER WITH THE
END 1 TO 5 DEGREES DOWN FROM
CONTROL END 1 TO 5 DEGREES DOWN
HORIZONTAL (SEE BELOW)
FROM HORIZONTAL (SEE BELOW)
STEEL CABLE
OR CHAIN
QUICK LINK
CONTROL END
MUST BE 1 TO 5 DOWN
FROM HORIZONTAL
ATTENTION:
INSTALLATION LAYOUT
FOR SAFE CLEARANCES
0.91m MINIMUM
TOP TO CEILING
I-40: 4.5 FT.
I40 - 1.37m MINIMUM
MINIMUM POINT OF
POINT OF COMBUSTION
COMBUSTION CONE
CONE TO FLOOR
TO FLOOR
THIS
HANGING
BRACKET
I-40 Manual and Spark Ignition
POSITION THE GAS HOSE AND ELECTRICAL POWER CORD
POSITION THE GAS HOSE AND ELECTRICAL POWER CORD
OUTSIDE OF THE HOT ZONE DIRECTLY ABOVE THE HEATER.
OUTSIDE OF THE HOT ZONE DIRECTLY ABOVE
POSITION THE GRAS HOSE AND POWER CORD TO AVOID
THE HEATER. POSITION THE GAS HOSE AND POWER CORD
ANY OPPORTUNITY FOR CONTACT WITH THE HOT CANOPY
TO AVOID ANY OPPORTUNITY FOR CONTACT WITH THE HOT
SURFACE OF THE HEATER.
CANOPY SURFACE OF THE HEATER.
MINIMUM 0.91m CLEARANCE
TO COMBUSTIBLES
TO COMBUSTIBLES
FLOOR
NOT THIS
CONTROL END
OF HEATER
Owner's Manual • I-40
MINIMUM 3 FT.
CLEARANCE
FLOOR
11