A Open HARDWARE FOR STEP 1. Remove outer packaging.
1
B Attach BASE FRAME (2) to MAIN FRAME (1) using 4 BOLTS
(A), 4 SPRING WASHERS (B) and 4 FLAT WASHERS (C)
from the top and 2 longer BOLTS (E), 2 SPRING WASHERS
(B) and 2 FLAT WASHERS (C) from the bottom.
C
Insert 2 BOLT COVERS (D) as shown.
D REQUIRES 2 PEOPLE: Lift and tip MAIN FRAME (1) into
upright position. Remove STYROFOAM BLOCKS (3).
Hardware For Step 1
Description
Qty
A
Bolt (55 mm)
4
B
Spring Washer
6
C
Flat Washer
6
D
Bolt Covers
2
E
Bolt (65 mm)
2
1
D
A
B
C
2
C
A
B
C
4
3
A Open HARDWARE FOR STEP 2.
2
B Attach CRANK ARM (5) to UPPER LINK ARM (6) using
1 BOLT (F), 2 FLAT WASHERS (C) and 1 NUT (G).
C
Attach the front of FOOT PAD (8) to UPPER LINK ARM (6)
using 1 BOLT (H), 2 FLAT WASHERS (I) and 1 NUT (J).
D Attach the rear of FOOT PAD (8) to LOWER LINK ARM (7)
using 1 BOLT (K), 2 FLAT WASHERS (I) and 1 NUT (J).
E
Repeat on other side.
Hardware For Step 2
Description
F
Bolt (50 mm)
C
Flat Washer (M8)
G
Nut (M8)
H
Bolt (130 mm)
I
Flat Washer (M10)
J
Nut (M10)
K
Bolt (100 mm)
B
E
Remove
twist ties
Qty
2
4
2
2
8
4
2
8
J
F
C
5
G
I
6
H
7
K
5