Planning Installation; Wiring Connections - Everbilt EFSUB5-122HD Guía De Uso Y Cuidado

Bomba sumergible de 4 pulg.
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Pre-Installation (continued)

PLANNING INSTALLATION

Inspect the pump and motor for delivery damage. Report any damage immediately to the shipping carrier or to your dealer.
The well driller should thoroughly develop the well (that is, pump out all fine sand and foreign matter) before the pump is installed. See the
Initial Start-Up section of this document.
Pump performance is based on pumping clear, cold, liquid water with no entrained air. Warranty is void in the following conditions:
If the pump has pumped excessive sand – excessive sand can cause premature wear to pump.
If water is corrosive.
If entrained gas or air are present in the water being pumped – these can reduce flow and cause cavitation which can damage pump.
If pump has been operated with discharge valve closed – severe internal damage will result.
Install the pump at least 15 to 20 ft. (4.5 to 6 M) below the lowest water level reached with the pump running (lowest draw-down water
level), and at least 5 ft. (1.5M) above the bottom of the well.
GROUNDING THE PUMP
WARNING: Risk of electric shock. Can shock, burn or kill. Permanently ground the pump, motor, and control box before connecting the
power supply to the motor.
Ground the pump and motor in accordance with the local codes and ordinances. Use a copper ground wire at least as large as wires
carrying current to motor.
The motor is supplied with a copper ground wire. Splice this ground wire to a copper conductor that matches motor wire size specified in
Wiring Connections for wire splicing instructions.
Permanently ground the pump, motor and control box before connecting the power cable to power supply. Connect the ground wire to the
approved ground first and then connect to the equipment being installed.
Do not ground to a gas supply line.
WARNING: Risk of electric shock and fire. Can shock, burn or kill. If using a drop wire larger than No. 10 (5.5 mm
2
(8.4mm
) wire) between the pump and control box, run wire to a separate junction box. Connect the junction box to the control box with a
2
No. 10 (5.5 mm
) or smaller wire (depending on amp rating of the pump). For more information, contact your local code officials.

Wiring Connections

All wiring must meet National Electrical Code or Canadian Electrical Code and local code requirements. Use only copper wire when making
connections to pump and control box.
To avoid over-heating wires and excessive voltage drop at the motor, ensure the wire size is at least as large as the size listed in the
following tables for your horsepower pump and length of wire run.
NOTICE: When built-in overheating protection is not provided, use with an approved overload equipped motor control that matches motor input in full
load amps. Select or adjust overload element(s) in accordance with control instructions. When built-in overheating protection is provided, use with an
approved motor control that matches motor input in full load amperes.
Recommended Fusing Data - 60 Hz., Single Phase, 3 Wire
Submersible Pump Motors
HP
Volts
Fuse Size
Stand
Dual
HP
1/2
230
15
10
3/4
230
25
15
1
230
30
15
C.B.
15
20
25
Recommended Fusing Data - 60 Hz., Single Phase 2 Wire
Submersible Pump Motors
HP
Volts
Fuse Size
Stand
Dual
Volts
Volts
1/2
230
15
10
3/4
230
15
10
1
230
20
15
5
Please contact 1-844-883-1872 for further assistance.
2
) (for example, No. 8
C.B.
10
15
20
HOMEDEPOT.COM

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido