Installation; Notes On Installation - Waeco CoolAir CA850S Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 54
CA-850S_EBA.book Seite 28 Freitag, 16. April 2010 6:46 18
CoolAir
6

Installation

a
Caution
The air conditioning roof unit may only be installed by qualified personnel
from a specialist company. The following information is intended for tech-
nicians who are familiar with the guidelines and safety precautions to be
applied.
6.1

Notes on installation

These installation instructions must be read completely prior to the instal-
lation of the air conditioning roof unit.
The following tips and instructions must be observed wile installing the air
conditioning roof unit:
Warning
d
Make sure that all electrical components are electrically discharged
before carrying out work on them!
Always check whether any vehicle components could be damaged or
their operation impaired by the unit before installing the air condition-
ing roof unit. You can use fig. 1 on page 3 and fig. 2 on page 3 to
check the dimensions of the installed unit. The dotted line indicates
the middle of the sunroof opening.
Before installation, find out (by consulting the manufacturer of the
vehicle) whether the construction is designed for the static weight and
the loads of the air conditioner when the vehicle is in motion. The
manufacturer of the air conditioning roof unit assumes no liability
whatsoever.
The roof inclination of the mounting surface may not exceed 8° in the
direction of travel.
The supplied assembly parts must not be modified during installation.
The ventilation slots (grill) may not be covered (minimum distance
from other attachment parts: 10 cm).
You can connect the unit to the battery via the lorry's terminal block or
directly. The terminal block is to be preferred for the connection. On
some vehicles, larger consumers connected to the terminal block are
switched off after a short while if the power requirement is too high.
Ask your vehicle manufacturer for the specifications of the terminal
block.
28
Installation

Publicidad

Tabla de contenido
loading

Tabla de contenido