Handover Checklist
•
Check all safety devices of the door and if necessary readjust them.
•
Check all door functions against the checklist and sign off the completed list.
•
The Declaration of Perforance must be completed by the technician.
EN
Location of the door:
1
Door plate
1.
Condition of door panel
2.
Attachment to door roller
3.
Attachment to bottom beam
4.
Welds in door panel
5.
Securing balls / storm- and windhooks *
6.
Reinforcement profiles *
2
Bottom beam
7.
Guides
8.
Bottom seal *
9.
Break-Away *
3
Column
10. Securing the column on the wall
11. Securing consoles to the wall
12. Dents / scratches
13. Fixed side seal
4
Drive
14. Attachment
15. Leaks
16. Engine brake (audible click)
17. Setting end positions
5
Tensioning and balancing system *
18. Tension belt / elastic
19. Fastening tension belt / elastic
20. Return pulleys
21. Roll-up disks
22. Tension spring *
23. Buckle loops *
24. Buckle tightened *
Declaration from engineer
and/or installation firm
We declare that we have complied with the manufacturer's
instructions in accordance with EN 13241-1 Industrial,
commercial and garage doors and gates IIA.
Installation company:
Street and property number:
Postal code / Place:
6
approved
approved
approved
approved
approved
Please keep these assembly, operating and maintenance instructions as long as you use the product!
Commissioned on:
6
Control
25. Push buttons on the box
26. Stop switch
27. General cabling
7
Operation
28. Push buttons *
29. Pull switch*
30. Photocell + reflector *
31. Radar *
32. Induction loop *
33. Receiver *
34. Hand-held transmitter *
35. Key switch *
8
Security
36. Safety photocell *
37. Safety edge protection *
38. Light screen *
39. Infrared *
9
Hood *
40. Attachment
41. Seal tightness
10
Miscellaneous
42. Maintenance sticker
43. Type plate
* if applicable
Phone / fax:
Place of delivery:
Name of engineer:
approved
approved
approved
approved
approved
Company stamp
Date:
Signature of engineer: