Installation - Daikin FVXS09NVJU Manual De Instalación

Ocultar thumbs Ver también para FVXS09NVJU:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Indoor Unit Installation
4-2� Installation
Exposed installation
1) Secure the indoor unit
<Floor Installation>
• Secure the indoor unit using 6 screws. (2 screws for floor and 4 screws for rear wall)
2 screws
3/16" × 1" (M4 × 25mm) (field supply)
<Wall Installation>
• Secure the
• Secure the indoor unit using 4 screws for rear wall.
5 screws
3/16" × 1" (M4 × 25mm)
(field supply)
2) Once refrigerant piping and drain piping connections are complete, fill in the gap of the through hole with putty.
A gap can lead to condensation on the refrigerant pipe, and drain pipe, and the entry of insects into the pipes�
3) Attach and screws the each side casings and upper casing in their original position using 7 screws.
4) Attach the front grill in their original position using 4 screws.
5) Attach the front panel in their original position.
• Attach the string to the right, inner-side of the front grille.
• Close the front panel and slide until the stoppers click outside.
9
Casing
mounting plate using 5 screws.
A
A
Mounting plate
The
plate should be
installed on a wall
which can support
the weight of the
indoor unit.
5 screws
3/16" × 1" (M4 × 25mm)
(field supply)
A
mounting
Molding
A
4 screws
3/16" × 1" (M4 × 25mm) (field supply)
4 screws
3/16" × 1" (M4 × 25mm) (field supply)
Slide the stoppers
Mounting plate
A
The
mounting
plate should be
installed on a wall
which can support
the weight of the
indoor unit.
Molding
English

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Fvxs12nvjuFvxs18nvju

Tabla de contenido