Remove cover from Landing Pad.
Use assembled towers and pads to
determine placement on vehicle.
NOTE: CAREFULLY CHOOSE
LOCATIONS AVOIDING
BRACING, ELECTRICAL WIRING
OR OTHER OBSTRUCTIONS.
With the SkyLine or Control
Tower cover open, mark the
outline of the holes on the
vehicle roof with a #2 pencil.
1033034C-2/12
Attach SkyLine
or Control Tower
to Landing Pad.
Arrange Towers on car top from front to back and side
to side. Place Towers considering the following:
Center punch
the holes.
Use eye
protection!
Close cover.
• Design and strength of
vehicle top.
• Compatibility of
accessories and crossbar
spread requirements (see
side bar).
• Easy access to loaded
accessories.
NoTE: IF YOU HAVE NO MECHANICAL EXPERIENCE AND ARE NOT
THOROUGHLY FAMILIAR WITH THE INSTALLATION PROCEDURES,
YOU SHOULD HAVE THE PRODUCT INSTALLED BY A PROFESSIONAL
INSTALLER SUCH AS A QUALIFIED GARAGE OR AUTO BODY SHOP.
Drill holes.
• Start with 1/8"
• Final hole size
pilot holes.
should be 25/64".
Do not drill through Landing Pads.
CRoSSbAR REqUIREMENTS:
The distance between
the Yakima crossbars is
determined by the accessories
you wish to carry.
Refer to the instructions for the
accessory to determine how
much crossbar spread your
accessories require.
CAUTIoN:
DRILL HoLES 1/4" DEEP.
USE DRILL SToP oR
MASKING TAPE To INSURE
ACCURACY!
HOLES SHOULD BE PRECISELY
ROUND AND FREE OF BURRS.