Transporting And Setting Up The Machine; Installation Location; Transporting The Machine; Unpacking The Delivery - Weidmuller Cutfix 8 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 67
4

Transporting and setting up the machine

4.1 Installation location

The installation location must meet the following require-
ments:
– Stable foundation with straight, even surface (for ma-
chine weight, see section 3.1).
– Keep 30 cm work area free on both sides and in front of
the machine.
– Electricity connection easily accessible close by.

4.2 Transporting the machine

► Always wear work shoes with foot protection
when transporting the machine.
► Note the weight of the machine
(see section 3.1). Use a transport aid if necessary.
► To move the machine, always use the side carry han-
dles.
► To prepare the machine for shipping (e.g. in the event of
servicing), use the transport packaging.

4.3 Unpacking the delivery

► Check the delivery for completeness (for scope of deliv-
ery, see below).
► Store away the transport packaging.
► Ensure that the operating instructions are accessible to
the user at all times.

4.4 Scope of delivery

– Trimming machine
– Mains connection cable (10 A, 250 V)
– CD with software PCCUT
– Operating instructions

4.5 Establishing connections

► Set up the machine in the intended location.
► Insert the power cable into the mains connection socket
(Figure 3.2, 13) of the machine and connect it to the
power supply.
24
2571390000/01/11.2017

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido