Descargar Imprimir esta página

Commissioning - ABB IN/S 1.1 Instrucciones De Montaje Y Funcionamiento

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 51

Commissioning

The setup and commissioning procedure is described in detail in
the "Internet Gateway Product Manual" (document number:
2CDC 510 006 D0201; it can be downloaded from the Internet at
www.abb.de/stotz-kontakt).
Meaning of LED displays
LAN LINK
flashes or is lit when the device detects activity on the
LAN:
network (e.g. during data transfer).
LINK:
is lit when the device detects a connection to a
network.
is lit when the device takes a telephone connection.
ON
is lit when the voltage supply is present and the
device is ready for operation (approx. 40 sec. after the
voltage supply is connected).
ON
18

Publicidad

loading

Este manual también es adecuado para:

In/s 2.1