Descargar Imprimir esta página

Commissioning - ABB IN/S 3.1 Instrucciones De Montaje Y Funcionamiento

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 52
Montageanleitung_v1_ABB_03-06-12.qxd

Commissioning

The setup and commissioning procedure is described in detail in the
product manual (see CD-ROM).
Meaning of LED displays
LAN:
flashes or is lit when the device detects activity on the net-
work (e.g. during data transfer).
LINK:
is lit when the device detects a connection to a network.
:
is lit when the device takes a telephone connection.
ON:
is lit when the voltage supply is present and the device is
ready for operation (approx. 40 sec. after the voltage sup-
ply is connected).
LAN
LINK
18
23.06.2003
ON
10:07
Seite 18

Publicidad

loading

Este manual también es adecuado para:

In/s 4.1