Commissioning And Service - Graf 340020 Instrucciones De Instalación Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Before commissioning and at every inspection, the lifting out mechanism must be positioned at 90° to the
inlet so that no large objects such as leaves and twigs can catch on the handle. The straining filter is
removed for cleaning and the basket must be thoroughly cleaned with water until all the pores are open. It
is advised to clean every 4 to 5 weeks (more often in autumn due to more leaves and twigs) or according
to requirements.
The filter strainer basket must be lightly pressed into place taking care that the seal sits precisely after
every cleaning.
At the occasion of each inspection, the overflow siphon must be checked and flushed in necessary.
Otto Graf GmbH – Carl-Zeiss-Str. 2-6 – D-79331 Teningen – Tel.: 0049/(0)7641/589-0 – Fax: 0049/(0)7641/589-50
GRAF SARL – 45, Route d´Ernolsheim – F-67120 Dachstein Gare – Tel.: 0033/388497310 – Fax: 0033/388493280
GRAF Iberica – C/Marquès Caldes de Montbui, 114 baixos – ES-17003 Girona – Tel.: +34/972 913 767 – Fax: +34/972 913 766
GRAF Ltd – Maidstone, Kent – UK-ME16 8Ry – Phone: +44 (0) 16 22 68 65 50
info@graf.info
www.graf.info
7.

Commissioning and service

12 / 24
12-2011

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

340021340022342002

Tabla de contenido