Graf one2clean Manual De Instalación página 20

Ocultar thumbs Ver también para one2clean:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

13.
-
Push the jack into the sampler (until it snaps into
place).
15.
Insert the jack into the profile for holding the parti-
tion wall from above.
17.
The cord must be secured to the pipe aerator (6
mm hole). The air hose (19 mm) must be con-
nected on the opposite side. Systems for more
than 7 inhabitants have two pipe aerators.
4. Assembling the set-up kit
6 mm hole
Insert the jack into the tank along with the sampler.
Insert the sampler's outflow connection into the
sleeve of the outflow pipe (use lubricant!). The
sleeve connection must be secured with a Spax
screw.
Position the pipe aerator(s) on the bottom of the
tank. It must be slid under the scum board such
that even the first chamber is ventilated. Secure the
cord to the hose using a cable tie.
18 / 44
14.
16.
18.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

106850106851106852106853

Tabla de contenido