Complete The Installation - Kohler K-5031 Guía De Instalación Y Cuidado

Ocultar thumbs Ver también para K-5031:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

K-5026/K-5148 Only
Washer
Lag Bolt

5. Complete the Installation

Verify the bathroom sink is level. Make any needed adjustments.
For K-5026/K-5148 Only: Secure the bathroom sink with the
washers and lag bolts through the outermost mounting holes.
Apply a thin bead of silicone sealant along the edge of the sink
where it meets the wall. Immediately wipe away any excess
sealant.
Gently press the overflow cap into the sink overflow.
Kohler Co.
9
1293762-2-A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-5148K-5150

Tabla de contenido