HQ-Power VDP150SC3 Manual De Instrucciones página 2

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

4. Installation
a) Lamps
• Only fit or replace a lamp when the device is unplugged from the mains.
• Let a lamp cool down before replacing it as the temperature of a lamp can reach 700°C during operation.
• When handling a halogen lamp, do not touch it with your bare hands. Use a cloth to insert or remove it.
• Do not install lamps with a higher wattage than that for which this device was designed.
• Replace any deformed or damaged lamp with a lamp of the same type (see "7. Technical Specifications", p.5):
1. Unscrew the 4 screws on the bottom of the housing and gently remove the lower half of the housing.
2. Remove the old lamp and insert the new one.
3. Carefully reposition the lower half of the housing and fasten the 4 screws.
Remark: Do not operate the device when the cover is open.
b) Fuse
• Only fit or replace a fuse when the device is unplugged from the mains.
• If the lamp burns out, chances are you will need to replace the fuse as well.
• Replace a blown fuse with a fuse of the same type and rating (see "7. Technical Specifications" on p.5):
1. Unscrew the fuse holder at the back underneath the power connector with an appropriate screwdriver.
2. Remove the old fuse and install a new one.
3. Replace the fuse holder and fasten it with the screwdriver.
c) Mounting the Device
• Have the device installed by a qualified person, respecting EN 60598-2-17 and all other applicable norms.
• The construction to which the device is attached should be able to support 10 times the weight of the device for
one hour without deformation.
• The installation must always be secured with a secondary attachment e.g. a safety cable.
• Never stand directly below the device when it is being mounted, removed or serviced. Have a qualified technician
check the device once a year and once before you bring it into service.
• Install the device in a location with few passers-by that is inaccessible to unauthorised persons.
• Overhead mounting requires extensive experience: calculating workload limits, determining the installation
material to be used... Have the material and the device itself checked regularly. Do not attempt to install the
device yourself if you lack these qualifications as improper installation may result in injuries.
• Adjust the desired inclination angle via the mounting bracket and tighten the bracket screws.
• Make sure there is no flammable material within a 50cm radius of the device.
• Have a qualified electrician carry out the electric connection.
• Connect the device to the mains with the power plug. Don't connect it to a dimming pack.
• The installation has to be approved by an expert before the device is taken into service.
5. Use
a) DMX512 Connection
Connect the provided XLR cable with the female 3-pin XLR output of your controller and the other side to the male 3-
pin XLR input of the VDP150SC3. You can connect multiple VDL150SC3's in series. Use a screened cable with XLR
input and output connectors. Please refer to the figure below.
VDP150SC3
2
VELLEMAN

Publicidad

Tabla de contenido
loading

Tabla de contenido