Descargar Imprimir esta página

Mettler Toledo SWB220 Guia De Instalacion página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

SWB220 Weigh Module » Installation Guide
Before You Begin
1
»
Never extend or cut the load cell's
cable length. Always remove the
load cell before welding.
1
Check Overload Gap
4
»
2
»
2
Tools You Need:
- OR -
- OR -
- OR -
C
, K
(LB)
g
apaCity
g
110 (250)
220 (500)
550 (1250)
1100 (2500)
Plan Your Layout
,
(i
)
ap
mm
nChes
0.11 (0.004)
0.21 (0.008)
0.39 (0.015)
Download Installation Guide:
Installation Guide is available in:
English, Spanish, French
www.mt.com/ind-downloads-SWB220
Position the Weigh Modules
3
»
Block tank when in
raised position.
Lift tank
1
TANK
Position weigh modules under tank
2
legs according to your layout

Publicidad

loading