Typical Installation - Watts FD-190-PR/190-PR-60 Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Typical Installation

Note: Pronto!™ floor drains arrive assembled and must be partially disas-
sembled before installation.
Plastic top assembly with bubble level should remain on the drain until drain is
securely installed and concrete cured. The plastic top assembly is designed to
keep the nickel bronze grate from being damaged during installation and keeps
concrete from entering the drain.
Note: Make sure cover is snug
but do not over tighten
1. Leader Pipe
Leader pipe should be cut so that the height of the finished drain is at or just
below the height of the finished floor. The leader pipe should be cut evenly with no
burrs or debris attached.
Drain Body
Drain Body
Leader Pipe
Leader Pipe
3
Plastic Top Assembly
w/Grate & Shank
Clamping
Collar
Drain Body

Publicidad

Tabla de contenido
loading

Tabla de contenido