5. Plastic Top Assembly
Adjust the top of the drain with the plastic cover in place by screwing it into the drain
body until the top of the cover is flush with finish floor grade. Plastic top assembly
should sit tight against the clamping collar ensuring that no concrete seeps into the
drain assembly.
Make sure cover is snug but do not over tighten.
Removable Top Assembly With Bubble Level
Recessed Slot
6. Finish Floor
Finished floor slab should be poured flush with the top of the plastic leveling cap.
The floor surface may require hand finishing the concrete if the drain is above the
floor surface.
View After Concrete Is
Poured & Label Is Removed
Bubble Level
Recessed Slot
5