During Operation - STERWINS 250 TP-3 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 15
6. OPERATION
Connecting the discharge line
• Screw the standard connector
• Assemble the discharge line onto the standard connector
Connectiong the power supply and operation
• Open any shut-off valves in the discharge line (accessories, water stop, etc.), so that air in the
intake line can escape.
• Lift and hold the discharge hose at least 1m vertically above the pump (to prevent any flow
medium from escaping from the pump via the discharge hose), then connect the power cable
to an earthed 220-240V 50Hz power supply (10 amp fuse minimum), and put down the
discharge hose after pump has primed.
NOTE: The maximum self-priming head of 8m is only achieved if
the pump is filled until it overflows via the filter chamber and the
discharge hose is held at least 1m higher, so that no water can escape via the
discharge hose.

During operation

• The motor is protected against overheating by an integrated thermostat. In the event
of overheating, the thermostat will automatically switches off the pump. The pump will
automatically estart after it has cooled down.
• Depending on the suction height and the amount of air in the intake line, priming can take
anywhere between 1 minute to 2 minutes. If it takes longer than this, the pump should be
refilled with water. Always remove the plug from the socket before refilling!
• If at any time after use the pump to be removed, it must always be refilled with water
whenever it is powered up and used again.
EN
20151208 SPECIFICATIONS 250 TP-3 EXE.indd 118
onto the pressure connector
8
8
118
.
2
with a clamp
.
7
08/12/15 16:21

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido