Best U102E Manual De Usuario página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARE WALL CABINET
1. Prior to wall cabinet installation, remove doors
and door mounting hardware.
2. Cut an opening into the bottom panel to the
dimensions shown.
3. Cut out openings for the duct and electrical
wiring.
4. Install cabinet on the wall and secure per cabinet
manufacturer's recommendations. The cabinet
must be securely fastened to studs and framing
behind the drywall prior to hood installation.
Cabinet-
Widht
30"
36"
42"
PREPARE THE HOOD
1. Loosley assemble both mounting brackets to
the hood using M4 x 30mm machine screws
and flat washers.
2. Place the 8" damper/duct connector on top of
the range hood discharge opening. Remove
tape from damper flaps.
Secure with (4) 3.9 x 9.5mm screws.
3. Assemble wall spacer to the hood with (3) 3.9 x
9.5mm screws.
NOTE: The spacer is designed to fill a 5/8" gap
between the wall and the back of the hood. If
the gap is larger, a non-combustible material
that is in compliance with local building codes
must be used to fill this gap.
"A"
"B"
28-1/2"
15"
34-1/2"
18"
40-1/2"
21"
- 8 -
MOUNTING SCREWS
MACHINE
(3.9x9.5mm)
SCREWS
(M4x30mm)
WASHERS
MOUNTING SCREWS
(3.9x9.5mm)
WALL
SPACER

Publicidad

Tabla de contenido
loading

Tabla de contenido