Inspection And Servicing - Graf PLATIN Instrucciones Para Montaje Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

7.1
Assembling the extension
For larger coverage heights an extension is needed. To insert the extension into the tank dome, soft soap
is needed. Into the highest groove of the extension the profile seal is inserted an greased generously.
Afterwards push the telescopic dome shaft into the extension and adapt it to the planned area surface.
1 Extension= max. earth-cover 955 mm respectively 1055 mm
(in connection with Mini respectively Maxi telescopic dome shaft)
Telescopic dome shaft (can be inclined by 5°)
Extension
Profile seal
Tank dome Platin
The entire system must be checked for leaks, cleanliness and stability at least every three months.
The entire system should be serviced at intervals of approx. 5 years. In this case, all parts of the system
must be cleaned and their function checked. Servicing should be carried out as follows:
Drain the tank completely
Clean surfaces and internal parts with water
Remove all dirt from the tank
Check that all internal parts are firmly seated.
Otto Graf GmbH – Carl-Zeiss-Str. 2-6 – DE-79331 Teningen – Tel.: +49 7641 589-0 – Fax: +49 7641 589-50
GRAF Distribution S.A.R.L – 45, route d´Ernolsheim – FR-67120 Dachstein Gare – Tél.:+33 388 49-7310 – Fax: +33 388 49-3280
GRAF Iberica Tecnología del Plástico S.L. – Marquès Caldes de Montbui, 114 – ES-17003 Girona – Tel.: +34 972 913767 – Fax: +34 972 913766
GRAF UK Ltd – Target House – Thorpe Way Ind. Estate – Banbury – Oxfordshire – UK-OX16 4SP – Tel.: +44 1608 661-500 – Fax: + 44 1608 665-466
mail@graf.info
www.graf.info
7.
Assembly of the extension
8.

Inspection and servicing

18 / 45
2014-05

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

390000390001390002390005

Tabla de contenido