5.2.3
Assembly of stationary bridging steps
• Assembly the stairways (10/5) and (10/6), refer to
Section 5.2.5.
• Mount the step guard rail, right (10/3) refer to Section
5.2.7.
• Mount the plug-in right step guard rail if necessary,
refer to Section 5.2.8.
• Mount the side platform guard rail (10/2) refer to Sec-
tion 5.2.9.
• Mount the plug-in side platform guard rail if neces-
sary, refer to Section 5.2.10.
• Mount the left step guard rail (10/1), refer to Section
5.2.7.
• Mount the plug-in left step guard rail if necessary, re-
fer to Section 5.2.8.
• Mount the double barrier if necessary, refer to Sec-
tion 5.2.19.
• Mount the locking chain if necessary, refer to Section
5.2.21.
• Mount the footboard (10/4), refer to Section 5.2.13.
• Place the stationary bridging steps at the use position
and mark out holes in the support areas. All holes (Ø
8 mm) in the ground brackets (10/7) and (10/8) are to
be used for the mounting.
• Drill holes and insert the dowels. Observe the safety
rules given in Section
5.1
• Position the stationary bridging steps and fix it with
screws.
5.2.4
Assembly of working platforms, module system
The platforms of the working platforms,
module systems can be mounted in differ-
ent variants (a, b, c, d, e) (Figure
supporting shank and the fastening elements
are to be used, depending on the assembly
type.
• Mount the supporting shank on the platform, refer to
Section 5.2.6.
• If necessary, mount several working platforms, mod-
ule systems, refer to Section 5.2.22.
• Bring the working platforms, module systems to the
installation location.
• Install and fasten the steps, refer to Section 5.2.5.
• Mount the step guard rail refer to Section 5.2.7.
• Mount the plug-in step guard rail if necessary, refer
to Section 5.2.8.
• Mount the lateral platform guard rail refer to Section
5.2.9.
• Mount the plug-in side platform guard rail if neces-
sary, refer to Section 5.2.10.
• Mount the front platform guard rail if necessary, refer
to Section 5.2.11.
• Mount the plug-in front platform guard rail if neces-
sary, refer to Section 5.2.12.
o
N
291311
without fail.
4]. The
• Mount the double barrier if necessary, refer to Sec-
tion 5.2.19.
• Mount the hinged door if necessary, refer to Section
5.2.20.
5.2.5
Assembly of stairway
The slot nuts (nuts) for mounting the step
rail guard (13/4) and the square head
bolts for the ground brackets are to be in-
serted before installing the stairway.
Starting at a certain height on the sys-
tems, there are sections with 3 screw
channels on the stairway. The slot nuts
and square screws are to be used as fol-
lows (12):
Item 1 w Guard rail fastener, fastening to gusset plate
of the platform, ground bracket mounting
Item 2 w Guard rail fastener
Item 3 w Fastening to gusset plate of the platform,
ground bracket mounting
• Latch one slot nut (11/2) in each screw channel (11/1)
on the stile on which the step guard rail is to be
mounted. Latch slot nuts on the second stile too, if
guard rails are to mounted on both sides.
• In systems in which the step guard rails are still fas-
tened by rail supports (13/1) to the stile of the stair-
way, latch more slot nuts if necessary (depending
upon the number of rail supports).
Exercise caution while introducing the
stairway, as there is the danger of getting
squeezed.
• Introduce the stairway (14/1) in the gusset plates (14/
4) in such a way that the square head bolts are intro-
duced into the screw channels.
• Push the stairway (14/1) fully against the platform
cheek (14/2).
• Install four mounting nuts (14/3) on each side and
tighten with a torque of 25 Nm.
• In case of stationary bridging steps, the second stair-
way is to be mounted as described in this section.
- 23 -
GB