SMA CELLULAR LTE MODEM KIT Instrucciones Breves página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SMA Solar Technology America LLC
Electrical installations
All electrical installations must be carried out in accordance with the local standards and the
National Electrical Code
• Before connecting the inverter to the utility grid, contact your local grid operator. The
electrical connection of the inverter must be carried out by qualified persons only.
• Ensure that no cables used for electrical connection are damaged.
Quick Reference Guide
®
ANSI/NFPA 70 or the Canadian Electrical Code
®
CSA C22.1.
CellModKit-US-10-IS-xx-10
2 Safety
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cellmodkit-us-10

Tabla de contenido