INSTALLATION
STEP
1
Determine
the
Header
Bracket
Location
To preventpossible SERIOUSiNJURYor DEATH:
• HeaderbracketMUSTbe RIGIDLY fastenedto
structural support on headerwall or ceiling, otherwise
garage door might not reversewhen required.DO NOT
install headerbracketover drywall
• Concreteanchors MUST be used if mounting header
bracketor 2x4 into masonry,
• NEVER try to loosen, move or adjust garagedoor,
springs, cables,pulleys, brackets,or their hardware,all
of which are under EXTREME tension.
• ALWAYS call a trained door systemstechnicianif
garagedoor binds, sticks, or is out of balance.An
unbalancedgaragedoor might not reversewhen
required.
Installation procedures vary according to garage door
types. Follow the instructions which apply to your
door.
SECTIONAL DOOR
AND ONE-PIECE DOOR WITH TRACK
1. Close the door and mark the inside vertical
centerline of the garage door.
2. Extend the line onto the header wall above the
door.
You can fasten the header bracket within 4 feet
of the left or right of the door center only if a
torsion spring or center bearing plate is in the
way; or you can attach it to the ceiling (see
page 14) when clearance is minimal. (It may be
mounted on the wall upside down if necessary,
to gain approximately 1/2".)
If you need to install the header bracket on a 2x4
(on wall or ceiling), use lag screws (not provided)
to securely fasten the 2x4 to structural supports as
shown here and on page 13.
3. Open your door to the highest point of travel as
shown. Draw an intersecting horizontal line on the
header wall 2" above the high point, This height
will provide travel clearance for the top edge of the
door.
NOTE: Door clearance
brackets
are available
for
sectional
doors when headroom
clearance is less
than 2". See accessory
page 39.
Proceed to Step 2, page 14.
Vertical
__
Finished-
Centerline
Ceiling
2x4
StrucJural
Ceiling
I
Header Wall
._L--_2"
Track
Highest
Point
of Travel
--
DoOr
Sectional door
with curved
track
Header Wall
Track
'--2"
One-piece
door with
horizontal
track
of Travel
12