red lion RLSP Serie Instrucciones De Instalación página 2

Bombas para jardín y césped
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

VOLTAGE WIRING INSTRUCTIONS - 2 HP
115 V
BROWN
B
LINE
L1
WHITE
LINE
L2
A
ELBOW
PVC ADAPTER
FOOT VALVE
PRIMING PORT
DRAIN PLUG
230 V
WHITE
B
L1
L2
BROWN
A
WELL
SEAL
RIDGED PVC PIPE
Figure 4
1-1/2" DISCHARGE PORT
2" RIDGED PIPE
ELBOW
2" SUCTION PORT
2" ADAPTER
2" FOOT VALVE
Pump Location: Install the pump in a clean, dry, and ventilated
location that provides adequate drainage, room for servicing,
and protection from freezing temperatures. Bolt down the pump
evenly on a good foundation, preferably concrete, to prevent the
development of unnecessary stress. Locate the pump as close
as possible to the water supply to reduce friction losses in the
suction pipe and to provide for maximum capacities. A foot valve
must be used.
LINE
Suction Pipe: Use only new, clean pipe or hose the same size
as that of the pump suction tapping. If the pump is installed any
appreciable distance away from the water supply, increase the
LINE
suction pipe by one size. The suction pipe must always slope
upwards from the water source to the pump to avoid air pockets
in the line. In cases where the pump has to be reprimed often and
it is not necessary that a lot of water be delivered, it is advisable to
use a 90° or 45° elbow on the suction line. This enables the pump
to prime sooner and also prevents kinking of the hose. A check
valve is recommended to ensure easier priming. In cases where
a maximum volume of water is required over a prolonged period,
the suction line should be led almost horizontally to the pump.
Use non-toxic thread compound on all pipe joints, and tighten all
connections thoroughly. Connect a strainer to the bottom end of
the suction pipe and ensure that it is well submerged at all times.
WARNING - RISK OF ELECTRICAL SHOCK
WIRING: Make sure the voltage and frequency of the power
supply agrees with that stamped on the motor nameplate. If in
doubt, check with the power company.
WARNING - ELECTRICAL PRECAUTIONS
All wiring, electrical connections, and system grounding must
comply with the National Electrical Code (NEC) and with any local
codes and ordinances. Employ a licensed electrician.
SINGLE PHASE: Determine incoming voltage to motor. Where
possible, use 230V. Connect wiring to terminal board located inside
motor end cover. Be sure voltage connections agree with wiring
diagram on motor nameplate.
WELL POINT
INSTALLATION
CHECK VALVE
2" GALVANIZED PIPE
WELL SEAL
WELL POINT
2" RIDGED PIPE
Figure 5
2
INSTALLATION
2" PVC ELBOW
2" PVC ELBOW
MULTIPLE WELL
POINT INSTALLATION
CHECK VALVE
TO PUMP
GALVANIZED
PIPE
WELL POINT

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rlsp-75Rlsp-100Rlsp-150Rlsp-200Rlsp-250

Tabla de contenido