Descargar Imprimir esta página

Cequent Performance Products 2500 Instrucciones De Installación página 7

Publicidad

6. Remove ground wire from the frame. Use an 18mm socket to remove all of the bed bolts. Then raise and support
the truck bed.
7. Insert base rails as shown in the following steps (Figures 10 through 13). Refasten truck bed bolts after rails are
inserted. Torque bed bolts to 75 ft. lbs.
Front Hat Channel
Fuel
Cell
Rear Hat Channel
F
r
a
m
Figure 10
e
Step 1 : Slide the base rail system in
between the hat channels. Lift and
position it so that it rests on the frame.
8. Loosely attach clamping brackets (5) to frame using 1/2" x 6.5" hex head bolts (6) and 1/2" lock washers (7). Hand
tighten keeping the flat portion of the bracket even on the bottom of the frame. (Figure 12). Be sure that the rail
holes align with holes in the bed.
Forward
30852IN – 16MAY17 REV. C
Exhaust
F
r
a
m
e
5
7
6
PCN9762
©2011, 2014 , 2017 HORIZON GLOBAL
Axle
Forward
Axle
Step 2 : Position the base rail system near
the rear hat channel as shown so that it
rests evenly on both sides of the frame.
Front Hat Channel
Exhaust
Fuel
Cell
Rear Hat Channel
Figure 11
Figure 12
Printed in Mexico
7

Publicidad

loading

Este manual también es adecuado para:

3500