8"
(20.3 cm)
2x4
Elbow
Riser Tube
1. Prepare the Site
Rough-in the Plumbing
IMPORTANT! For exterior wall installations: Ensure proper wall
insulation to prevent frozen pipes.
Attach a 2x4 between two studs according to the illustration.
Position the riser tubes 8" (20.3 cm) apart, then level, and secure
the elbows and risers to the 2x4.
Temporarily secure a pipe nipple to each elbow with sealant tape.
Confirm the pipe nipples are perpendicular to the front edge of
the vertical 2x4s.
Confirm the Rough-in Plumbing
Hand tighten the two wall union shanks onto to each pipe nipple.
NOTE: Do not damage the O-rings or the finish on the faucet
assembly when tightening the union nuts.
Secure the faucet assembly to the wall shanks with the attached
union nuts.
Kohler Co.
Pipe Nipple
Wall Union Shank
Union Nut
3
1069114-2-A