GE Tetra Contour Serie Guia De Instalacion página 7

Tabla de contenido

Publicidad

Tetra
Contour
®
METHOD C - Attaching Tetra Contour LS to Tetra Contour
RISK OF FIRE: Waterproof wire connection for outdoor or wet installations. Weather box is required for all outdoor or wet locations
electrical connections.
White wire with
red stripe
Tetra Contour LS
1
Tetra Contour LS can be connected to formable Tetra
Contour for custom shapes. Separate wires and identify
conductors as positive (+) and negative (–). Strip ends
back 0.5 in. (13mm).
3
Insert wire connectors into weather
box. Fill with electrical grade
silicone and close box.
If you have questions about these instructions or your Contour application, contact support at tetra.support@gecurrent.com
Additional Instructions for Retrofit
1. (Existing Signs Only) Prior to installation, survey the site for information regarding power and accessibility inside and outside the building.
Ensure that the branch circuit supplying the existing transformer or ballast will be within the voltage ratings of the new LED power supply,
and have a current rating not exceeding 20A, or that permitted by applicable local, state, or country electrical codes (whichever is less).
2. (Existing Signs Only) Remove the existing lighting equipment to be replaced, such as neon tubing or fluorescent tubes; and associated
transformers and ballasts. Care should be taken not to break the existing neon or fluorescent tubes. NOTE: Follow all federal and local
regulations when disposing of neon tubing, fluorescent tubes, transformers and ballasts.
3. (Existing Signs Only) If removal of the existing lighting equipment eliminates the disconnect switch, as required by applicable local, state,
or country electrical codes; a new disconnect switch must be installed.
4. (Existing Signs Only) Repair and seal any unused openings in the electrical enclosure. Openings greater than 12.7-mm (1/2-in) diameter
require a metal patch secured by screws or rivets and caulked with non-hardening caulk. Smaller openings may be sealed with non-
hardening caulk.
5. Using the layout guidelines above, determine required number of LED modules required to illuminate the sign.
6. A Tetra
24VDC Class 2 Power Supply, as listed below, must be used with this retrofit kit. Determine the number of Tetra
®
Supplies required to power the number of LED modules required to illuminate the sign, so as not to overload the Tetra
Supply chosen.
7. Follow Method A, B or C to mount the Tetra Contour.
8. Connect the DC output of the power supply to the LED modules using the Electrical Connections instructions above.
9. Connect the power unit to the supply in accordance with the applicable local, state, and country electrical codes, and the instructions found
in the power supply installation guide.
10. If required, the disconnect switch shall be installed by qualified personnel, in accordance with applicable local, state, and country
electrical codes.
+ –
+
+
Tetra Contour
Weather box can be painted
4
Secure the weather box using a
#6 or #8 (M2 or M3) screw. When
using twist-on connectors, weather
box is required for all outdoor
electrical connections.
WARNING
Center wire (–)
White wire (–)
Tetra Contour LS
2
Splice the white wire with red stripe (+) of Tetra Contour
LS to the two outside wires (+) of Tetra Contour and
splice the white wire (-) of Tetra Contour LS to the center
wire (-) of Tetra Contour.
7
Installation Guide
White wire with red stripe (+)
Outside wires (+)
Tetra Contour
NOTE: For assembling
accessories like
connectors and
corners, see Page 4.
Class 2 Power
®
Class 2 Power
®

Publicidad

Tabla de contenido
loading

Tabla de contenido