Kohler K-110 Instrucciones De Instalación página 3

Adaptadores de bañera montados sobre la cubierta y sobre la pared con rociador
Ocultar thumbs Ver también para K-110:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. INSTALLATION
FOLLOW ONLY THE STEPS THAT APPLY TO YOUR INSTALLATION.
FREE-STANDING
Remove the temporary plugs from the water supply
couplings. Thread the tee bracket into the hole at the back
of the overflow elbow.
Loosen the setscrew in the tee bracket to align the pipe
holders with the hot and cold supply rough-in.
Loosen the setscrews in the pipe holder and flange.
Carefully slide the plated supply pipe through the pipe
holder and flange.
Fit the supply pipe into the water supply roughing-in,
and tighten it with a strap wrench. Tighten the setscrews
in the pipe holder and flange.
Repeat this procedure for the other supply pipe.
DECK-MOUNT
Remove the temporary plugs from the water supply
couplings. Construct a frame for the deck with two 1"
(2.5cm) diameter holes measuring 8" (20.3cm) apart from
center-to-center.
Slide the plated supply pipes through the holes, and
connect them to the bath roughing-in previously
installed.
NOTE: Ensure that the supply pipes are securely
strapped to the framing below the deck.
Loosen the setscrew in the flange, and slide the flange
down from the top of the supply pipe so it rests on the
deck.
D
1008209-2-
Pipe
Holder
Tee Bracket
Setscrew
Setscrew
8" (20.3cm) Center-To-Center
1" (2.5cm) diameter holes
8" (20.3cm)
Supply Pipe
(Hot)
Fig. #6
Flange
Setscrew
3
Rod
Overflow
Elbow
Fig. #3
Tee Bracket
Pipe Holder
Plated Supply Pipe
Flange
Fig. #4
Fig. #5
Deck
Supply Pipe
(Cold)
Plated Supply Pipe
Fig. #7
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-110mK-331K-331mK-6905K-6905mK-16210 ... Mostrar todo

Tabla de contenido