Skymsen MAXICONV VP Manual De Instrucciones página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

The plug has three round pins, and one of them is a ground pin. It is mandatory that the
three spots are on before starting the appliance.
The oven installation must be done with necessary care to avoid problems and damages to
the equipment and to guarantee its full operation.
When you receive this appliance make sure that it has not suffered any damages during
transportation. If necessary, contact the representative or the factory immediately.
Make sure that the electrical and hydraulic instalations are made by trained personel;
All the building installation is the client´s responsibility
The installation of ovens and food displays require:
Electric power;
Exclusive Breakers and power cables;
Grounding (mandatory)
Water point
Exhaust System;
Make sure that the electrical characteristics of the building follow the technical
specifications in the identification tag in the equipment in the back part.
Correctly measure the switch and the power grid cables.
Use an exclusive switch to the oven.
We recommend the installation of a speed plug connection.
Only trained technicians are allowed to open the electric system panel
When you receive the machine, check the registered tension in the electric cable tag.
Make sure that tension in the power grid where the appliance is installed is
compatible with tension indicated in the tag in the electric cable.
IMPORTANT
9

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Maxiconv sv

Tabla de contenido