Kohler K–2449 Manual Del Usuairo página 6

Ocultar thumbs Ver también para K–2449:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Finished Wall
Vanity
Mounting Rail
Wood Screw
Leveler
3. Install the Vanity
Position the vanity against the finished wall.
Verify the vanity is level. If it is not level, tip the vanity to allow
access to the appropriate leveler(s) and turn the leveler(s)
counterclockwise to raise the vanity, or clockwise to lower it.
Mark two pilot holes an equal distance from the centerpoint of
the mounting rail.
Drill two pilot holes through mounting rail at the marked
locations.
Tighten a wood screw through each of the two drilled holes until
the vanity is flush and secure against the finished wall.
1061207-2-A
6
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido