Installing Power Sequencers
It makes no difference which power sequencer is installed first.
Installing a Power Sequencer
FIGURE 1-5
1. Pull the three cables through the power sequencer slot on the front of the rack and
connect them to the rear panel of the power sequencer.
Cable A0 (or B0) attaches to the bottom connector and A1 (or B1) to the middle
connector. The top connector has five keys to ensure proper alignment. The master
(large) key is at the top of the sequencer.
2. Slide the power sequencer into its slot on the right side of the rack, as viewed
from the front.
3. When the power sequencer is seated in place, tighten the two screws on the front
of the power sequencer.
Chapter 1 Installing a Power Distribution System
1-7