Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21
4. Repeat the process for the second power sequencer.
5. Reinstall the rack side panel.
6. Apply the provided labels "A" and "B" to their respective sequencers.

Power Cable Labels

1. Note the power strip outlet number for each system connected to the power strip.
2. At the system end of each power cable, apply the appropriate adhesive label from
the label set provided.
1-8
Power Distribution System Installation Guide • November 2002

Publicidad

Tabla de contenido
loading

Productos relacionados para Sun Microsystems 806-2997-10

Tabla de contenido